We had a contractor stop work in the middle of a project (cutting and paving lengthy walking trails through an urban forest, including a bridge or two, and minor building facilities). We made a claim under the Performance Bond; the surety has identified a new contractor. I need either a template or some form language I can use for the subsequent contractor - noting that he is taking over another contractor's work, that he has had time to inspect the site, inspect on-site materials, reconcile material quantities, inspect acceptability of work already performed to ensure it has not degraded since the original contractor quit, etc., etc. Does anyone have anything that might be useful? I have been fortunate enough not to have encountered this particular issue before.
Steve
Stephen M. Hines
Senior Assistant City Attorney
Office of the City Attorney
City of Garland
P.O. Box 469002
Garland, Texas 75046-9002
Telephone: (972) 205-2380
Facsimile: (972) 205-2389
Cellular: (972) 743-9564
[cid:image001.jpg@01D5F94F.262E5180]
[cid:image003.png@01D2D2D3.D514AC80]
"Far and away the best prize that life offers is the chance to work hard at work worth doing." - Pres. Theodore Roosevelt